Why SEA-CURE was chosen: SEA-CURE® was the most cost effective material for meeting EPA copper discharge limits. By fall of 2012 all three units at this location will be utlizing SEA-CURE for their condensers.

Fuel: Coal

MW: 600

Material Replaced: Admiralty Brass

Cooling Source: River water with a Cooling Tower

SEA-CURE ship date: April 2012 (est)

For a free material evaluation  click here.

If you wish to talk to a SEA-CURE technical expert  click here.